Nedre Skorilla is located in Snillfjord, Heim municipality.
The project consists of a pipeline of approx. 640 metres, the intake is built together with the existing water intake for fish farming. The power station has an outlet directly into the sea.
Started in February 2023 and put into operation in spring 2024. The plant produces around 5.5 GWh, enough for 275 households annually.
Status: In operation
Year of construction:
Production: 5.5 GWh
Price area: NO3
Location: Home
Customer: Svorka småkraft AS