Svorka power plant in Surnadal and is one of the largest in the region with 25 MW and 112 GWh in annual production.
In a condition review, the power plant has been required to drop the minimum water flow below the current power station, if the power plant is not in operation.
Njord has been given the job of designing and building a bypass arrangement to ensure minimum water flow downstream of the current power station, in cases where the current power station is not producing.
Arbeidene ble utført innenfor tidsrammen på 6 uker
Status: Utført
Year of construction: 2026
Production: 112
Price range: NO3
Lokasjon: Surnadal